Description:
- Consultant: Erga Progress Engineering Consultants
- Main contractor: Dubai Contracting Company LLC (DCC)
- MEP subcontractor: Al Bonian International Electromechanical Works
- Location: Nad Al Hamar, Dubai, UAE
- Details: Residential & commercial building (2B+G+12+R)
- Technical details: 96 Apartments, B.U.A. 25,000 m2, Total MEP value 27M AED, Air cooled chilled water system 690 TR.
Responsibilities:
- Utilized HAP software, ASHRAE standards, “UAE fire and life safety code of practice,” NFPA standards, “international plumbing codes” and DEWA/DM calculation sheets and regulations to produce design drawings for various projects.
- Coordinated and attended weekly meetings with the main contractor and consultant to discuss technical issues and to get approvals on the drawings from local authorities.
- Prepared BOQ, material submittals, shop drawings, and ensured their compliance with the project’s specification and requirements, and obtained approval from the consultant.
- Reviewed and corrected all design calculations (fans external static pressure, pumps head…etc.)
- Ordered all required materials, managed the delivery time and received them at the site.
- Coordinated with the subcontractors and supervised the installation activities.
- Planned and followed up the work schedule to meet the target time of the project.
- Monitored the construction progress and ensured that the work done was in accordance with the quality standards of the company.
- Conducted onsite inspections with consultant and main contractors and got approval on all required tests.
- Performed MEP commissioning visits on the site with the suppliers and commissioning agencies, identified any issues on the construction and resolved them.
- Planned and arranged inspections with local authorities and obtained completion certificates on the installation and proper function of the systems.