Beirut City Centra Mall

  • Title: Mechanical Site Engineer
  • Client: Majid Al Futtaim (MAF)
  • Location: Beirut, Lebanon

Description:

  • Consultant: Barbanel Middle East s.a.l.
  • Main contractor: Al Saad General Contracting (SGC)
  • MEP subcontractor: Al Bonian Int’ltek
  • Location: Al Hazmiya, Beirut, Lebanon
  • Details: Shopping mall (3B + G + 3 commercial floors + R)
  • Technical details: Total MEP value 42M $, B.U.A. 210,000 m2, Water cooled Chilled water system 4,400 TR, 3 water cooled chillers, 3 cooling towers, 2 Boilers, 74 AHU’s/FAHU’s, 186 Fans.

 

Responsibilities:

  • Prepared BOQ, shop drawings, and ensured their compliance with the project’s specification and requirements, and obtained approval from the consultant.
  • Reviewed and corrected all design calculations (fans external static pressure, pumps head…etc.)
  • Coordinated with the subcontractors and supervised the installation activities.
  • Planned and followed up the work schedule to meet the target time of the project.
  • Monitored the construction progress and ensured that the work done was in accordance with the quality standards of the company.
  • Conducted onsite inspections with consultant and got approval on all required tests.
  • Performed MEP commissioning visits on the site with the suppliers and commissioning agencies, identified any issues on the construction and resolved them.